Transfer Data To Google Cloud

Transfer Data To Google Cloud

Reading time1 min
#Cloud#Data#Migration#GoogleCloud#TransferAppliance#DataMigration

Large-Scale Data Migration to Google Cloud: Engineering Transfer Appliance for Minimum Downtime

Attempt a multi-terabyte dataset upload via WAN, and you’ll likely see progress grind to a halt—deadlines slip, bandwidth caps trip, and critical systems lag. For anything larger than a few terabytes, cloud migration demands more than a robust connection. Google’s Transfer Appliance sidesteps these pitfalls with a physically shipped, encrypted storage device engineered for bulk cloud ingestion at scale.


Why Network-Only Transfers Fail at Scale

On paper, transferring data to the cloud is trivial: select files, start an upload. In practice:

  • Symmetric gigabit internet (~125 MB/s) moves 100 TB in ~9.3 days—assuming zero packet loss, no throttling, and no competing traffic. Actual transfers can drag on for weeks.
  • Frequent interruptions (rsync partial, scp hangs, S3 multipart upload errors) require custom retry scripts, not always robust under high IOPS.
  • Critical applications, dependent on source data, may experience performance hits or outright downtime during extended transfer windows.
  • Enterprise circuits are rarely provisioned for sustained multi-Gbps egress; ISPs may rate-limit after high usage.

For anything above 20 TB, network transfer cost (both time and money) quickly outweighs convenience.


What Is Google’s Transfer Appliance — and When Is It Justified?

Google Transfer Appliance is a secure, rack-mountable unit (100 TB or 480 TB usable capacity) designed for bulk, offline shipping of petabyte-scale datasets. The process:

  1. Google ships an empty, encrypted appliance (10GbE/40GbE, RAID-6 or similar redundancy).
  2. Local team copies data over the LAN, using rsync, robocopy, or other tooling.
  3. After local verification, the device is shipped back to Google.
  4. Data is ingested directly into Google Cloud Storage, mapped to the project and buckets specified during provisioning.

Data never traverses the public internet, eliminating both bandwidth and uptime constraints. This method is justified for:

  • Data volumes exceeding what can be pushed over network lines within an acceptable cutover window (multi-TB, often >20 TB).
  • Environments with regulatory or business constraints permitting only encrypted, auditable transfer.
  • Scenarios requiring minimal service downtime—think transactional DB exports, batch archives, multi-department analytics data.

Note: For <10 TB, Google’s online Transfer Service is more efficient.


Transfer Workflow: Experienced Approach

0. Preflight:
Inventory data source(s). Pay attention to actual file count, small files, and filesystem overhead—filesystems with millions of inodes (e.g., lots of 2 KB files) can max IOPS before hitting storage capacity. Always reserve at least 10% headroom over raw data size.

1. Ordering
Provision appliance via Cloud Console (Storage > Transfer Appliance).

  • Specify GCP billing and shipping info.
  • Select device size (100 TB or 480 TB).
    Reality: Appliance wait times vary by region; for AsiaPac or EMEA, buffer 2-3 additional business days.

2. Data Staging
Once received (typically in tamper-evident pelican case), connect via 10GbE/40GbE to core switch. Appliance runs a secured web UI (https://appliance.local:8080); CLI workflows (rsync preferred, robocopy for Windows) are fully supported.

# Example (Linux; rsync 3.1+ recommended)
rsync -avxHAX --progress --numeric-ids --exclude='.DS_Store' /mnt/source/ /mnt/transfer-appliance/

Tip: For millions of small files, tar (with compression disabled) can greatly improve throughput:

tar cf - /mnt/source | pv | dd of=/mnt/transfer-appliance/image.tar bs=1M
  • Encryption is performed automatically with customer-provided keys (managed via GCP KMS).
  • Use the built-in SHA256 verification script before shipping.
  • Appliance reports status and available storage via UI and syslog stream.

Known issue: UEFI time drift or mismatched NTP can trigger transfer rejections. Sync clock prior to beginning bulk copy, especially on Windows hosts.

3. Ship & Chain of Custody
After data is staged and verified, shut down appliance (UI button or poweroff CLI). Return using provided, trackable courier.
Physical security: Devices are encrypted, but short-handling delay at checkpoints is not uncommon. Log all custody handoffs in your own tracking DB.

4. Import & Monitoring
Track transfer status via Cloud Console. Data is ingested to target bucket(s) using internal Google network speeds (not customer bandwidth). Typical 100 TB upload: 24–72h post-receipt.

Sample GCP Stackdriver notification:

[TRANSFER_APPLIANCE] Import complete: 99.99% verified, 2 warning (non-fatal CRC mismatch; see log: gs://migration-logs/transfer-20240608-x1.crc)

Pro tip: In multi-appliance scenarios, stagger returns—Google only ingests one appliance per customer/project at a time.


Example: Retail Batch Analytics Table Migration

A mid-sized retailer needed to migrate 150 TB of historical point-of-sale data to BigQuery. Prior sFTP and VPN attempts failed—7 MB/s real throughput, days of cutoff exposure.
Actual approach:

  • Splitted input by year into two 100 TB appliances.
  • Loaded via 1GbE LAN using rsync --partial overnight, zero production impact.
  • Used GPG signatures to verify batch before shipment.
  • Final import to GCS completed in three business days.
    After import, cron-watched Stackdriver logs flagged a single batch CRC mismatch—quickly resolved with partial file re-upload.

Non-Obvious Tips from the Field

  • Appliances use XFS; filenames exceeding platform limits (>255 characters, UTF-16 oddities) can cause copy errors. Clean paths beforehand.
  • Use screen or tmux—long-copy jobs can time out SSH sessions.
  • For compliance, request deletion certificates from Google once data is ingested and appliance is purged.

Transfer Appliance Alternatives: Suitability Table

Use CaseRecommended Approach
<10 TB total volumeNative Online Transfer Service
Ongoing incremental syncTransfer Service + VPC peering or SFTP
Live transactional workloadsData staging / export with Transfer Appliance, plan cutover carefully
Data subject to ITARPre-clear appliance with Google; review US export controls

Bottom Line:
Where network links bottleneck multi-TB workflows, Google Transfer Appliance transforms bulk data migration from weeklong ordeal to systematic, high-assurance process. Physical media isn’t perfect—plan around logistics, clock drift, and indirect costs—but for enterprise-scale moves, it solves problems WAN alone cannot, while maintaining compliance and operational continuity.


Comments or war stories regarding Transfer Appliance in production? Got an error not covered here? Drop details below—shared pain yields the best fixes.